During the winter the willows front left of 13 tee were removed and we were faced with stumps on a steep slope that could not be ground down by a conventional stump grinder. So, we were forced to dig them out with an excavator. As you can see a huge hole was dug and was immediately repaired to match the surrounding grade.
Monday, June 25, 2012
Spring Work
During the winter the willows front left of 13 tee were removed and we were faced with stumps on a steep slope that could not be ground down by a conventional stump grinder. So, we were forced to dig them out with an excavator. As you can see a huge hole was dug and was immediately repaired to match the surrounding grade.