Thursday, August 7, 2014

Fun in the sand

This past Monday the club held an event for the Boys and Girls Club Fundraiser and the golfing format was a scramble.  So, the crew and I took the opportunity to do something different with the raking of the bunkers.  We striped them!

Monday, July 28, 2014

Topdressing Fairways

Due to a number of factors our fairway topdressing program has been slowed this year.  Two weeks ago we became fully operational and the program on fairways is going strong.  Last week marked the first application of sand for the fairways on holes 9, 11, 15 & 17.  #4 was also topdressed for the second time since last fall.  

The success of the program on #6 fairway has encouraged us to expand it to include other fairways that suffer from soft conditions after rain events.  The before mentioned fairways have been identified as the ones in most need of a sand cap and will be topdressed on a regular basis.  The goal is 5 applications per fairway, per year at 10 tons/acre.   
Currently, we topdress: 
  • All greens (biweekly)
  • The chipping areas on #1 green, #8 green & #14 green (once a month)
  • The approaches on holes 4-10 & 17 (once a month)
  • The tees on holes 5-8 (once a month)

New Water Main


The Shakespeare House's water supply has been leaking for the past few months and before it gets worse or even blows we decided to install a new one.  To limit the disruption we chose to have the new 2" water line installed by a directional borer.

The old water line goes through the front lawn of the clubhouse.  The new line travels to the turnaround and 90's directly underneath the Bard's room.  This work was done last Thursday and Friday.  The plumbing will take place today to hook up the new service.

The pit near the flagpole is where the near water line begins and due to the age of the components we will be having a plumber install new valves and piping.  The walls of the pit will also be replaced.  As you can see they are in disrepair.

Saturday, June 28, 2014

A busy Wednesday.


With the closing of the club for the day, many projects were accomplished.  The morning started off with the chip and seal around the Hamlet.  The process involved the filling of any low areas with crushed asphalt, then an application of tar.  Pea stone was then applied for the finished product.  The pea stone looks identical to the material currently being used on the course, so it creates a nice transition.               





A month or so ago the Hamlet staff entered the pro shop and were hit with a terrible smell.  To their horror they found sewage water throughout the bathrooms and porch of the building.  The sewage lift station had shut down causing all of the water to back up into the building.  One of the pumps has gone bad and after more investigation it was found out that pumps were too old to repair/rebuild, so while the chip and seal process was going on new sewage pumps were installed in the lift station. 
The third and final project of the day was the pouring of concrete for our sand/mulch bins.  As you may know in the past we have had our topdressing sand deliveries dumped in the parking lot.  With topdressing of the fairways our sand use has increased to a point where it has become necessary to have an additional storage space for the sand.  The new sand bins will accommodate 2 -3 semi loads of sand and will help us from keeping the sand out of the parking lot. 







Friday, June 13, 2014

Sometimes things happen...

One little mistake and there you go into the pond!  Even though the crew at the club are skilled at their craft, mistakes do happen.  Max was eventually pulled out and the pond bank will be repaired. 

Wednesday, March 26, 2014

Spring is Here?

Spring is officially here, at least the calendar thinks so.  Yesterday we had 2" of fresh snow on the ground and this morning it was 15 degrees.  With the cold temps over the last few weeks the ground was hard enough for the crew and I to grind the stumps that were created from the winter tree removal.  Typically, we accomplish this task after the snow melts and the ground has dried.  So, a bit of a silver lining.

Normally, we are mowing at this time of the year.  But, this year it looks as though it will be a couple of weeks yet.  The 10 day weather forecast shows signs of warming but temps in the 40's with a couple of low 50's mixed in.  

Thursday, March 6, 2014

A New Viewpoint from 86ft in the Air


This past week I needed to rent a 86 foot tall mobile lift to remove a couple of dead trees near the buildings and to also trim the top of a large oak near 9t that had a large hanging branch in the top.  As I was driving the machine back to the shop I decided to take a picture.  Quite a view.....