Over the past two days Dan Kaiser and his crew installed drainage in a number of areas on the course that continue to hold water during and after rain events. Last night's .90" of rain was a great test for the work and I'm happy to say mission successful.
Areas that received drainage were: The path behind the Hamlet near 1T, the low area on the right side of 3 fw, the low area on the right side of 6 fw, a small spot in the front of 7 fw and the area near the front of 11 fairway, just past the red T box.
Path behind the Hamlet near 1T.
Area near the front of 11 fairway, just past the red T box.